Supporting Toll System Modernization Through Field Inspection

Construction inspection services were provided for the Bay Bridge Cashless Tolling Conversion on behalf of the Maryland Transportation Authority. The scope involved the removal of existing toll booths and canopy structures, the installation of overhead gantries, and the integration of advanced electronic tolling infrastructure.

Field inspections were performed to monitor demolition and concrete work, verify essential measurements and materials, and support maintenance of traffic operations throughout the phased construction process. By providing consistent oversight, the team ensured that the transition to cashless tolling proceeded safely and in accordance with project specifications.

Agency: Maryland Transportation Authority

Location: Anne Arundel County, MD

Project: Bay Bridge All-Electronic Tolling Conversion

Service: Construction Inspection

Client: EBA/Stantec/Michael Baker JVEBA/Stantec/Michael Baker JV

Value:

Service Completed: 2005