Improving Transit Safety and Reliability Through Comprehensive Metro Tunnel Rehabilitation Scheduling
Anthony Management Group provided Critical Path Method (CPM) scheduling services for the Metro Tunnel Liner Rehabilitation project for the Maryland Transit Administration. This critical transit infrastructure project involved extensive rehabilitation and repair of tunnel liners throughout the MTA Metro system and the Sudbrook Tunnel. Work included concrete spall repairs, hollow concrete repairs, crack repairs, leak remediation, steel liner bolt replacement, utility support replacement, conduit support replacement, junction box cover replacement, handrail support repairs, steel cleaning and painting, drain cover replacement, connection plate repairs, precast concrete walkway panel replacement, and other tunnel system improvements.
AMG developed and maintained the Primavera P6 CPM schedule, providing schedule development, progress tracking, critical path analysis, milestone management, and project controls services to support construction activities within active transit tunnels and ensure coordination of complex rehabilitation work across multiple tunnel segments.
Agency: Maryland Transit Administration (MTA)
Location: Baltimore Metro Subway System and Sudbrook Tunnel, Maryland
Project: MTA Metro Tunnel Liner Rehabilitation
Service: CPM Scheduling
Client: Manolis Painting, Inc.
Value: $9.4M
Service Completed: 2019